• About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service
Monday, September 7, 2026
Lake City Times
No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
No Result
View All Result
Lake City News
No Result
View All Result
Home Top News

AC approves roll out of Rooftop Solar Scheme

LCT Desk by LCT Desk
June 12, 2022
in Top News
Reading Time: 2min read
A A
Share on FacebookShare on TwitterWhatsappTelegram

READ ALSO

Terrorism in J&K shrinking towards zero: Shah

1st IFFJK begins today, set to feature global panel of filmmakers

Srinagar, Jun 11: The Administrative Council (AC), which met here under the chairmanship of Lieutenant Governor, Manoj Sinha, approved the installation of 200 MW of grid-tied rooftop solar power plants under the “Solar City Mission” in Jammu.
Rajeev Rai Bhatnagar, Advisor to the Lieutenant Governor, Dr. Arun Kumar Mehta, Chief Secretary, J&K and Nitishwar Kumar, Principal Secretary to the Lieutenant Governor attended the meeting.
The decision has been taken to implement the Government of India’s Grid-connected Rooftop Solar Scheme, Phase-II for the residential sector in Jammu and Kashmir to ensure that the electricity needs of the city are fully met from solar energy.
Under the project, 200 MW grid-tied rooftop solar power plants will be installed on 50,000 residential buildings in Jammu city by the Jammu and Kashmir Energy Development Agency (JAKEDA) under its “Solar City Mission” at an estimated cost of Rs 1040 crore. The project will be completed by March, 2024 and will have a lifetime of 25 years.
The Rooftop Solar Programme will provide subsidized installation of solar power panels on residential houses at the cost of Rs. 58,739, Rs. 53,995, Rs. 52,594, and Rs. 51,309 for Category-A (Up to 1 kW), Category-B (> 1 kW to 2 kW), Category-C (> 2kW up to 3 kW), and Category-D (> 3 kW up to 10 kW), respectively.
The Central Sector Scheme provides a central subsidy component of 40% of the project cost and a state subsidy component of 25% of the project cost for the installation of solar power panels, below 3 kW capacity, beyond which the central subsidy component remains at 20%. The subsidy will be provided to the beneficiaries through the DBT mode.
These rooftop solar power plants will be connected to the grid on a net metering basis. The investments made by the beneficiaries will be recovered at a rate of 25% annually on account of the saving of energy, with a payback period of approximately 4 years.
With the implementation of the project, J&K will benefit from the generation of approximately 280 million units of energy annually, with a corresponding reduction in carbon emissions of approximately 5.44 million tons, besides reaping gains from savings on account of inter-state transmission losses to the tune of 224 million units.
The generation of solar energy through the Rooftop Solar Programme will also help the energy-deficit UT of J&K in supplementing its energy needs, while assisting the DISCOMs in achieving the Renewable Purchase Obligation (RPO) Targets of 10.5% as fixed by the Government of India.
The project will also provide employment opportunities to local youth. Based on employment estimates, it is calculated that the 1 MW rooftop solar PV project generates a total of 40 full-time equivalent (FTE) jobs over the 25 years expected lifetime of the project, which includes highly skilled personnel for business development, design, sales, procurement, and project management; one-time jobs for construction and installation of the rooftop PV system; and unskilled resources required annually for cleaning activity of the plant.
A number of additional job roles are also created by solar PV grid-connected projects in secondary and tertiary roles vis-à-vis manufacturing and supply of system equipment such as inverters, cables, trackers, and other parts. As such, around 8000 jobs will be generated through the project.
The scheme mandates implementing agency, viz. JAKEDA to provide regular quality supervision and certification of the quality of material to be installed; periodic monitoring of physical progress and third-party quality checks from MNRE approved test centres; provide free maintenance for a period of 5 years post installation; install bi-directional net-meters; and ensure project completion within the given timelines.

Related Posts

Top News

Terrorism in J&K shrinking towards zero: Shah

September 7, 2026
Terrorism in J&K shrinking towards zero: Shah

New Delhi, Sep 6: Union Home Minister Amit Shah on Sunday said terrorism in Jammu and Kashmir was “gradually shrinking...

Read more
by LCT Desk
0 Comments
Top News

1st IFFJK begins today, set to feature global panel of filmmakers

September 7, 2026
IFFJK receives overwhelming global response

Srinagar, Sep 6: The 1st International Film Festival of Jammu and Kashmir (IFFJK)–2026 is set to witness the coming together...

Read more
by LCT Desk
0 Comments
Top News

Justice Pushpendra appointed Chief Justice of J&K and Ladakh High Court

September 7, 2026
Justice Pushpendra appointed Chief Justice of J&K and Ladakh High Court

Srinagar, Sep 6: Justice Pushpendra Singh Bhati, presently a Judge of the Rajasthan High Court, has been appointed as the...

Read more
by LCT Desk
0 Comments
Top News

Sakeena to take up medical interns’ issue at departmental level

September 7, 2026
Sakeena chairs BoDs meet of JKSCSTBC Development Corporation

Srinagar, Sep 6: Education and Health Minister Sakeena Itoo has conveyed her intent to take the lead in resolving the...

Read more
by LCT Desk
0 Comments
National

UN global map should depict J&K, Ladakh as per India’s official map: MEA

September 7, 2026
“Routine matter”: India on US’ revised travel advisory for J&K, Manipur

New Delhi, Sep 6: India on Sunday said any proposed global map initiated by the United Nations should depict Jammu...

Read more
by LCT Desk
0 Comments
Top News

High Court clears way for ACB probe into riverfront construction in Srinagar

September 7, 2026
Challenge to reservation policy: HC grants 6 weeks’ time to respondents to file counter affidavit

Srinagar, Sep 6: The Jammu & Kashmir and Ladakh High Court has permitted the Anti-Corruption Bureau (ACB) to continue its...

Read more
by LCT Desk
0 Comments
Next Post
IED detected on Srinagar-B’la highway, defused

IED detected on Srinagar-B'la highway, defused

  • About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service

© 2021 Lake City Times - Premium theme by GITS.

No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper

© 2021 Lake City Times - Premium theme by GITS.