• About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service
Friday, October 16, 2026
Lake City Times
No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
No Result
View All Result
Lake City News
No Result
View All Result
Home News

Work on Zojilla tunnel in full swing, over 8 km stretch completed: Officials

LCT Desk by LCT Desk
July 6, 2022
in News
Reading Time: 1min read
A A
Share on FacebookShare on TwitterWhatsappTelegram

Raja Syed Rather

Ganderbal, Jul 6: The work on the much-hyped Zojila tunnel is in full swing as out of 18 kilometres, work on 8.5 kilometres has been completed so far, officials said here on Wednesday.
Officials said that the tunnel is envisaged to provide all-weather connectivity to Ladakh and the National Highways and Infrastructure Development Corporation (NHIDCL) has paced up the work to ensure its timely completion.
Senior Manager Projects, Burhan Andrabi said that of total 18 kilometres, work on 8.5 kilometres of the tunnel has been completed, besides, two bridges and sub- structure has also been completed.
The work on the tunnel was started in the year 2018. The highway will have two twin-tube tunnels, 5 bridges, and 2 snow galleries.
Burhan said the second part is building the 14.15 kilometre Zojila tunnel itself, which will be 9.5 m wide, 7.57 m high with 2 lanes in shape of a horseshoe.
He added that in addition, a 2,350 metre concrete ‘cut and cover’ tunnel will be built, along with 3 ventilation caverns or shafts.
“Works also include construction of portals, control buildings, ventilation buildings and muck disposables along the route.”
With the construction of the tunnel, distance from Baltal to Minamarg will come down to 13 kilometres from the present 40 km and travel time is expected to be cut by an hour and a half.
The project is expected to lead to integrated development of both the UTs.
The tunnel will provide all-weather connectivity between Ladakh and Kashmir, which is otherwise hampered during winters as Zojila pass is covered in snow and avalanches during winters.

READ ALSO

35 JKAS officers to superannuate in 2027

Environment Committee reviews Anchar Lake conservation, inspects SKIMS waste management

Related Posts

News

35 JKAS officers to superannuate in 2027

October 16, 2026
JD Information Kashmir accords warm send-off to retiring Riyaz A Fazili, M Sultan

Srinagar, Oct 15: As many as 35 officers of the Jammu and Kashmir Administrative Service (JKAS) are set to superannuate...

Read more
by LCT Desk
0 Comments
News

Environment Committee reviews Anchar Lake conservation, inspects SKIMS waste management

October 16, 2026
Environment Committee reviews Anchar Lake conservation, inspects SKIMS waste management

Srinagar, Oct 15: The Committee on Environment of the Jammu and Kashmir Legislative Assembly, under the Chairmanship of MLA Mohammad...

Read more
by LCT Desk
0 Comments
News

Hundreds of families in J&K await PMAY-G assistance

October 16, 2026
Centre sanctions 5,061 houses for J&K under PMAY-G

Srinagar, Oct 15: With winter approaching, hundreds of families across Jammu and Kashmir who claim to be eligible for assistance...

Read more
by LCT Desk
0 Comments
News

Amid protests, SKUAST-K suspends academic activities at Faculty of Forestry

October 16, 2026
SKUAST-K to supply potato chips machines for farmers in Gurez

Srinagar, Oct 15: Following a month long protest, Faculty of Forestry at Sher-e-Kashmir University of Agricultural Sciences and Technology of...

Read more
by LCT Desk
0 Comments
News

Six Pulwama villages face drinking water shortage

October 16, 2026
Water shortage in Shopian as orchardist damage water pipes to spray pesticides

Pulwama, Oct 15: Residents of six villages in south Kashmir’s Pulwama district are facing severe hardships due to the disruption...

Read more
by LCT Desk
0 Comments
News

Vehicle crushes scooty rider to death in Kathua

October 16, 2026
Soldier dies after rifle goes off accidentally in Rajouri

Kathua, Oct 15: A 58-year-old scooty rider was killed after being hit by a vehicle at Sallan on the Dayalachak–Challan...

Read more
by LCT Desk
0 Comments
Next Post
Newborn baby found dead at Dal Lake

Newborn’s body found in Kokernag

  • About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service

© 2021 Lake City Times - Premium theme by GITS.

No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper

© 2021 Lake City Times - Premium theme by GITS.