• About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service
Wednesday, September 16, 2026
Lake City Times
No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
No Result
View All Result
Lake City News
No Result
View All Result
Home Top News

Katra-Banihal rail link faces hurdle at Tunnel 1 near Katra

‘Main boundary thrust cause of delay in completion of project’

LCT Desk by LCT Desk
May 5, 2024
in Top News
Reading Time: 2min read
A A
Share on FacebookShare on TwitterWhatsappTelegram

Amir Tantray

Jammu, May 4: As the entire country is waiting to get connected to Kashmir through railway line, the major hurdle which the northern railway is facing is in tunnel 1 near Katra.
The 3.2-km-long tunnel may take another six to seven months to get completed.
According to reports, taking a train to Kashmir valley has become a herculean task for the northern railways as they had to overcome several technical as well as geological issues in boring tunnels and laying the railway track.
“Though the biggest achievement for Konkan railways, construction agency, was to construct the 359-meter tall world’s highest single arch railway bridge over river Chenab connecting Bakkal and Kauri villages of Reasi district but the construction of Tunnel 1 near Katra is giving tough time to the construction agency,” said a source in Konkan railways.
The source said that there was a time when engineers thought of giving up the work on the tunnel but with the use of advanced technology, boring was completed by overcoming all the hurdles. “Now, the heading and benching work is undergoing and with all the difficulties and hurdles like cavities and other things engineers are ensuring the work is completed as soon as possible. Once the heading and benching is completed, laying of track will be done,” he said.
“It may take another six to seven months if things remain alright and no further issues explode,” he added.
The 338-km-long Jammu to Baramulla rail link will connect Kashmir valley with the rest of the country through rail link and besides road and air connectivity, people will be able to reach Kashmir through train.
Geologists had warned the northern railways and executive agency in the beginning of main boundary thrust issue on the line which is having young mountains, presence of water and loose strata. “These mountains have continuous growth which leads to cavity at many places and at times leads to major damage to the structures including the tunnels. The construction agency has to face similar challenges on regular intervals, due to which the project is getting delayed,” the source informed.
Moreover, the train service between Sangaldan and Reasi is almost ready with few smaller technical issues. “Within a month or so it is expected to start the train service between Sangaldan and Reasi which will add another feather to the cap of Konkan railways. Once the green signal is give the train service will pass through the highest railway bridge as well,” he added.

READ ALSO

Bring UCC to Parliament if you have numbers: CM to BJP

Have faith in my MLAs, not afraid they will move: Omar

Related Posts

Top News

Bring UCC to Parliament if you have numbers: CM to BJP

September 16, 2026
Have faith in my MLAs, not afraid they will move: Omar

Srinagar, Sep 15: Chief Minister Omar Abdullah on Tuesday asked the Bharatiya Janata Party-led government to bring the proposed Uniform...

Read more
by LCT Desk
0 Comments
Top News

Have faith in my MLAs, not afraid they will move: Omar

September 16, 2026
Have faith in my MLAs, not afraid they will move: Omar

Srinagar, Sep 15: "I have faith in my MLAs. I am not afraid that they will move," Chief Minister Omar...

Read more
by LCT Desk
0 Comments
Top News

CM, LoP lock horns over Assembly schedule

September 16, 2026
CM, LoP lock horns over Assembly schedule

Srinagar, Sep 15: Setting the stage for a stormy session of the Jammu and Kashmir Assembly, Chief Minister Omar Abdullah...

Read more
by LCT Desk
0 Comments
Top News

9 drone intrusions reported along J&K Int’l Border in 2025-26: MoD Report

September 16, 2026
Drones pressed in to trace man-eater leopard in Ompora

Srinagar, Sep 15: Annual report of the Ministry of Defence (MoD) has revealed that at least nine incidents of drone...

Read more
by LCT Desk
0 Comments
Top News

CM distributes appointment orders to 55 JKAS, Accounts Service officers

September 16, 2026
CM distributes appointment orders to 55 JKAS, Accounts Service officers

Srinagar, Sep 15: Chief Minister Omar Abdullah Tuesday distributed appointment orders to 55 newly selected candidates of the Combined Competitive...

Read more
by LCT Desk
0 Comments
Top News

Pakistan must handover Masood Azhar to India: BJP

September 16, 2026
Repair roads in Kashmir; ensure electricity during Ramadhan: BJP to admin

Srinagar, Sep 15: BJP J&K spokesman Altaf Thakur on Tuesday termed Pakistan’s latest claims surrounding Jaish-e-Mohammed chief Masood Azhar a...

Read more
by LCT Desk
0 Comments
Next Post
7000 pilgrims from Kashmir gear up for annual Hajj pilgrimage

7000 pilgrims from Kashmir gear up for annual Hajj pilgrimage

  • About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service

© 2021 Lake City Times - Premium theme by GITS.

No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper

© 2021 Lake City Times - Premium theme by GITS.