• About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service
Sunday, September 6, 2026
Lake City Times
No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
No Result
View All Result
Lake City News
No Result
View All Result
Home News

Govt adopts two pronged strategy to enhance flood resilience in Anantnag: Javed Rana

LCT Desk by LCT Desk
February 10, 2026
in News
Reading Time: 2min read
A A
Share on FacebookShare on TwitterWhatsappTelegram

READ ALSO

Sunil Sharma meets victim’s family in Chatroo

Govt committed to strengthen education ecosystem: Sakeena

Jammu, Feb 9: The government has adopted a two-pronged strategy, involving short-term and long-term measures, to mitigate the flood risks in Anantnag district and enhance overall flood resilience.
This was informed by Minister for Jal Shakti, Javed Ahmed Rana, in response to a question raised by Legislator Nizam-ud-din Bhat on behalf of Legislator Peerzada Mohammad Syed.
Javed Rana said that the recent interventions have significantly strengthened the flood management infrastructure and improved the district’s flood resilience. He informed the House that Anantnag district has 195 flood-prone villages and continuous efforts are underway to safeguard life, property and agricultural assets through sustained preventive and protective measures.
Providing details, the Minister said that permanent flood protection works have been undertaken under PMDP Phase-II for strengthening of flood management infrastructure in vulnerable areas of Anantnag district.
He informed that bank protection works have been executed at critical locations at a cost of Rs 10.07 crore, covering a length of 873 metres. He added that embankments in flood-prone stretches have been raised at a cost of Rs 18.97 crore, covering a length of 9,168 metre.
Javed Rana said that short-term measures are being focused on immediate preparedness and mitigation in vulnerable areas. He said that these measures include restoration of weak spots identified during safety audits of river embankments through temporary protection works, such as laying filled EC bags on bunds.
He further informed that with the onset of the flood season, advance preparedness is being ensured by pre-positioning EC bags at vulnerable locations and keeping men and machinery in a state of readiness.
Regarding the irrigation projects in Anantnag district, the Minister stated that the district has a total of 64 irrigation schemes, comprising 47 gravity schemes, 15 Lift Irrigation Schemes (LIS) and 2 Tube Well Irrigation Schemes (TWIS). He informed that these schemes cover a Cultivable Command Area (CCA) of 22,742 hectare, against which an irrigation potential of 18,667 hectare has been created with 18,481 hectare presently under utilization.
He further informed that 19 irrigation schemes were earlier taken up under the AIBP–PMKSY, of which, seven have been completed while the remaining are at various stages of completion.
Furthermore, seven irrigation schemes have been undertaken under UT Capex, of which, two stand completed while the remaining are currently in progress, he added.
Legislator Altaf Ahmad wani raised supplementary questions.

Related Posts

News

Sunil Sharma meets victim’s family in Chatroo

September 6, 2026
NC wants to protect relatives, workers who encroached Waqf land: Sunil Sharma

Kishtwar, Sep 5: Leader of Opposition (LoP) Sunil Sharma Saturday visited Gurninal in Chatroo and met the bereaved parents of...

Read more
by LCT Desk
0 Comments
News

Govt committed to strengthen education ecosystem: Sakeena

September 6, 2026
Govt committed to strengthen education ecosystem: Sakeena

Srinagar, Sep 5: Minister for Education, Social Welfare, Health and Medical Education, Sakeena Itoo Saturday said that the Government will...

Read more
by LCT Desk
0 Comments
News

J&K intern doctors continue protest, warn of hunger strike

September 6, 2026
Interns’ strike puts additional pressure on PG doctors at GMC Srinagar

Srinagar, Sep 5: The ongoing agitation by MBBS and BDS intern doctors across Jammu and Kashmir intensified on Saturday, with...

Read more
by LCT Desk
0 Comments
News

‘25,000 MTs of apples transported by rail from Kashmir last season’

September 6, 2026
Apple packing material cost increases, growers fear losses

Srinagar, Sep 5: Around 25,000 metric tonnes of apples were transported from Kashmir by rail during the last season, Director...

Read more
by LCT Desk
0 Comments
News

Commissioner SMC launches education initiative for children of sanitation workers

September 6, 2026
Commissioner SMC reviews arrangements for Eid-ul-Adha

Srinagar, Sep 5: Commissioner, Srinagar Municipal Corporation (SMC), Faz Lul Haseeb, on Saturday formally launched an education initiative aimed at...

Read more
by LCT Desk
0 Comments
News

Sopore bridge repair work ‘unsatisfactory’: MLA Kar

September 6, 2026
Sopore bridge repair work ‘unsatisfactory’: MLA Kar

Sopore, Sep 5: As Kashmir’s fruit trade gears up for the peak season, concerns over the condition of the vital...

Read more
by LCT Desk
0 Comments
Next Post
Upgradation of existing healthcare infrastructure Govt’s priority: Health Minister

Upgradation of existing healthcare infrastructure Govt’s priority: Health Minister

  • About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service

© 2021 Lake City Times - Premium theme by GITS.

No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper

© 2021 Lake City Times - Premium theme by GITS.