• About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service
Tuesday, July 1, 2025
Lake City Times
No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
No Result
View All Result
Lake City News
No Result
View All Result
Home Top News

Progress on Rs 1500 Cr project in JK ‘moderately unsatisfactory’: World Bank

LCT Desk by LCT Desk
July 31, 2021
in Top News
Reading Time: 1min read
A A
Share on FacebookShare on TwitterWhatsappTelegram

Faizan Wani

Srinagar, Jul 30: The World Bank has once again rated progress on the Rs 1500 crore infrastructure building project funded by it in Jammu & Kashmir, as “moderately unsatisfactory”.
In its latest implementation status and results report of the project, the multilateral funding institution has once expressed dissatisfaction over progress of the project, terming it as “moderately unsatisfactory”. The report was unveiled by the WB on June 30, 2021.
The Rs 1500 crore project was approved by WB in 2015 for reconstruction of the infrastructure hit by 2014 floods and strengthening J&K’s disaster management mechanism. Before its approval, a team of WB visited the affected areas of the State between February 1-6, 2015, to carry out a multi-sectoral assessment report of the damages and needs.
The project, according to the latest report, was given two-phase extension as majority of the critical infrastructure planned is unlikely to be completed by June 30, 2021.
“Since the majority of the critical infrastructure planned is not likely to be completed by the current closing date of June 30, 2021, a two-phase extension of the closing date has been granted to extend the closing date by 12-months initially and, upon achieving satisfactory progress on an action plan, by an additional 6 months thereafter,” read the report.
This is the second such extension to the project whose original closing date was June 30, 2020.
According to the report, the project has faced cascading challenges since its beginning which led to substantial implementation lags for the first two and a half years, from which the project has not fully recovered.
“The challenges include insufficient capacities of the implementing agencies to manage the project; the volatile security situation, social unrest, political transition, and disrupted telecommunications in the project areas; low supply of qualified contractors; and COVID-19 related constraints,” read the report.

READ ALSO

CM for revival of Buyer-Creator relationship

Lt Governor visits Baltal, reviews preparedness ahead of Amarnath Yatra

Related Posts

Top News

CM for revival of Buyer-Creator relationship

July 1, 2025
CM for revival of Buyer-Creator relationship

Srinagar, Jun 30: Chief Minister Omar Abdullah Monday said that through buyer-seller meets, the government is striving to revive the...

Read more
by LCT Desk
0 Comments
Top News

Lt Governor visits Baltal, reviews preparedness ahead of Amarnath Yatra

July 1, 2025
Lt Governor visits Baltal, reviews preparedness ahead of Amarnath Yatra

Srinagar, Jun 30: Lieutenant Governor Manoj Sinha Monday visited Baltal Base Camp and reviewed the preparedness ahead of Shri Amarnath...

Read more
by LCT Desk
0 Comments
Top News

All arrangements in place for smooth Amarnath Yatra: Omar

July 1, 2025
CM speaks to Jaishankar on safety of Kashmiri students in Iran

Srinagar, Jun 30: Chief Minister Omar Abdullah on Monday said the government has made all the arrangements for smooth conduct...

Read more
by LCT Desk
0 Comments
Top News

Heatwave tightens grip in Kashmir

July 1, 2025
Kashmir parts witness unexpected rise in day temperature

Srinagar, Jun 30: The intense heatwave once again tightened its grip in Kashmir with the weatherman here predicting intermittent rain...

Read more
by LCT Desk
0 Comments
Top News

Jhelum water levels dip sharply

July 1, 2025
Jhelum river sees alarming drop in water level

Rehan Qayoom Mir Srinagar, Jun 30: As the prolonged dry spell continues to grip the Kashmir Valley, the Jhelum river...

Read more
by LCT Desk
0 Comments
Top News

NRPC raises concern over J&K’s mounting liabilities

July 1, 2025
Centre transfers Srinagar-Leh transmission line to Power Grid

Srinagar, Jun 30: The Northern Regional Power Committee (NRPC) has raised a red flag over the whopping liabilities of Rs...

Read more
by LCT Desk
0 Comments
Next Post
‘Bossism’ in tuition centres

Don’t occupy footpaths

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service

© 2021 Lake City Times - Premium theme by GITS.

No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper

© 2021 Lake City Times - Premium theme by GITS.