• About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service
Friday, July 24, 2026
Lake City Times
No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
No Result
View All Result
Lake City News
No Result
View All Result
Home News

Noorbagh-Qamarwari bridge to be operational by June this year: CE R&B

LCT Desk by LCT Desk
March 31, 2022
in News
Reading Time: 1min read
A A
Share on FacebookShare on TwitterWhatsappTelegram

Ishtiyaq Ahmad

Srinagar, Mar 31: After missing several deadlines in the past, the much-awaited Noorbagh-Qamarwari Bridge is all set to be completed by June of this year.
Noorbagh-Qamarwari bridge popularly known as the “Cement Bridge” has historical importance in the Valley as it was the first bridge over the river Jhelum, which was constructed in concrete.
However, the present bridge at the place, as per the commuters, has been giving tough times to them. Notably, the bridge is an important link as it connects the Old City, Soura and other areas with north Kashmir.
The construction of the new bridge was started in the year 2011, but in the last nearly one and half decade, it missed several deadlines, sources said, adding that most of the time, the construction was stopped as there were several reasons behind the stoppage of the work and that took long to remove the bottlenecks.
Initially, the bridge was scheduled to be completed in the year 2014. Later, the deadline was extended upto March 2017 and then upto December 2018.
Chief Engineer, Roads and Building department, Er Rafiq said it is expected that the bridge will be completed by June of this year (2022).
“There were several issues, which took a long to be rectified,” he told news agency KINS, adding that the land issue was among the main bottlenecks that halted the work for a longer period.
“Many structures are to be removed and we are already on it,” he said.
Pertinently, the area where the bridge is being constructed is a congested place, thus simultaneously witnessing frequent traffic mess.

READ ALSO

CM visits Beerwah to assess flood damages

Javed Rana, Satish Sharma review flood damage, restoration works in Poonch

Related Posts

News

CM visits Beerwah to assess flood damages

July 23, 2026
CM visits Beerwah to assess flood damages

Budgam, Jul 22: Chief Minister Omar Abdullah Wednesday visited Beerwah in Budgam district to take stock of the damage caused...

Read more
by LCT Desk
0 Comments
News

Javed Rana, Satish Sharma review flood damage, restoration works in Poonch

July 23, 2026
Javed Rana, Satish Sharma review flood damage, restoration works in Poonch

Poonch, Jul 22: Minister for Jal Shakti, Forest, Ecology, Environment and Tribal Affairs, Javed Ahmed Rana, along with Minister for...

Read more
by LCT Desk
0 Comments
News

EOW chargesheets four in Airport job scam

July 23, 2026
Jobs on fake certificates: Crime Branch files chargesheet eight teachers, agent

Srinagar, Jul 22: The Economic Offences Wing (EOW) Kashmir on Wednesday filed a charge-sheet against four accused for their alleged...

Read more
by LCT Desk
0 Comments
News

Sakeena conducts surprise inspection of GMC & Associated Hospital Anantnag

July 23, 2026
Govt committed to strengthen educational ecosystem in J&K: Sakeena

Anantnag, Jul 22: Minister for Health and Medical Education, Social Welfare and Education, Sakeena Itoo Wednesday conducted a surprise inspection...

Read more
by LCT Desk
0 Comments
News

Army Rifleman dies after fall at Rajouri forward post

July 23, 2026
Soldier dies after rifle goes off accidentally in Rajouri

Rajouri, Jul 22: An Army rifleman died after slipping while on duty at a forward post in the Sunderbani sector...

Read more
by LCT Desk
0 Comments
News

DC Kulgam visits Qaimoh, Kudwani areas

July 23, 2026
DC Kulgam reviews functioning of SWD, implementation of Welfare Schemes

Kulgam, Jul 22: Deputy Commissioner (DC) Kulgam, Shahzad Alam, Wednesday visited Qaimoh and Kudwani areas to take an on-ground assessment...

Read more
by LCT Desk
0 Comments
Next Post
Traffic snarls choke Boulevard as Tulip garden attracts huge crowd

Traffic snarls choke Boulevard as Tulip garden attracts huge crowd

  • About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service

© 2021 Lake City Times - Premium theme by GITS.

No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper

© 2021 Lake City Times - Premium theme by GITS.