• About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service
Sunday, June 29, 2025
Lake City Times
No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
No Result
View All Result
Lake City News
No Result
View All Result
Home Top News

JK on mission to become largest clean energy-producing UT

200 MW grid-tied rooftop solar power plants to be installed on residential buildings

LCT Desk by LCT Desk
July 28, 2022
in Top News
Reading Time: 3min read
A A
Share on FacebookShare on TwitterWhatsappTelegram

READ ALSO

Amarnath Yatra truly peoples’ yatra: Lt Governor

CM launches ‘Mission YUVA’ at SKICC

Srinagar, Jul 27: J&K is on a mission to become one of the largest clean energy-producing UT in the country with an objective to reduce dependency on conventional sources of energy and enable J&K in attaining self-sufficiency in its energy needs.
J&K Government recognizes that renewable energy can also significantly increase J&K’s and the Nation’s energy security.
To achieve this milestone, the work is going on to implement the Government of India’s Grid-connected Rooftop Solar Scheme, Phase-II for the residential sector in Jammu to ensure that the electricity needs of the city are fully met from solar energy.
Under the project, 200 MW grid-tied rooftop solar power plants will be installed on 50,000 residential buildings in Jammu city by the Jammu and Kashmir Energy Development Agency (JAKEDA) under its “Solar City Mission” at an estimated cost of Rs 1040 crore. The project will be completed by March, 2024 and will have a lifetime of 25 years.
The Rooftop Solar Programme will provide subsidized installation of solar power panels on residential houses at the cost of Rs. 58,739, Rs. 53,995, Rs. 52,594, and Rs. 51,309 for Category-A (Up to 1 kW), Category-B (> 1 kW to 2 kW), Category-C (> 2kW up to 3 kW), and Category-D (> 3 kW up to 10 kW), respectively.
The Central Sector Scheme provides a central subsidy component of 40% of the project cost and a state subsidy component of 25% of the project cost for the installation of solar power panels, below 3 kW capacity, beyond which the central subsidy component remains at 20%. The subsidy is provided to the beneficiaries through the DBT mode.
An official said that these rooftop solar power plants will be connected to the grid on a net metering basis. The investments made by the beneficiaries will be recovered at a rate of 25% annually on account of the saving of energy, with a payback period of approximately 4 years.
With the implementation of the project, J&K will benefit from the generation of approximately 280 million units of energy annually, with a corresponding reduction in carbon emissions of approximately 5.44 million tons, besides reaping gains from savings on account of inter-state transmission losses to the tune of 224 million units, he added.
The generation of solar energy through the Rooftop Solar Programme will also help the energy-deficit UT of J&K in supplementing its energy needs, while assisting the DISCOMs in achieving the Renewable Purchase Obligation (RPO) targets of 10.5% as fixed by the Government of India.
The project will also provide employment opportunities to local youth. Based on employment estimates, it is calculated that the 1 MW rooftop solar PV project generates a total of 40 full-time equivalent (FTE) jobs over the 25 years expected lifetime of the project, which includes highly skilled personnel for business development, design, sales, procurement, and project management; one-time jobs for construction and installation of the rooftop PV system; and unskilled resources required annually for cleaning activity of the plant.
The scheme mandates implementing agency, viz. JAKEDA to provide regular quality supervision and certification of the quality of material to be installed; periodic monitoring of physical progress and third-party quality checks from MNRE approved test centres; provide free maintenance for a period of 5 years post installation; install bi-directional net-meters; and ensure project completion within the given timelines.
J&K has a good potential for solar energy and the renewable energy capacity would help to bridge a part of its power requirement. Under the new budget in PM KUSUM Scheme, 375 Solar Water Pumps will be installed in 2022-23 providing electricity benefit to 47159 souls, direct agriculture benefit to 18750 souls, and indirect agriculture benefit to 160000 souls.
Notably, Prime Minister Narendra Modi inaugurated a 500-kilowatt solar power plant at Village Pali of Samba which will make it India’s first “carbon-neutral Panchayat.

Related Posts

Top News

Amarnath Yatra truly peoples’ yatra: Lt Governor

June 29, 2025
Amarnath Yatra: Lt Governor interacts with prominent citizens, various stakeholders in Srinagar

Rehan Qayoom Mir Srinagar, Jun 28: Describing the upcoming annual Amarnath Yatra, slated to commence on July 3, as a...

Read more
by LCT Desk
0 Comments
Top News

CM launches ‘Mission YUVA’ at SKICC

June 29, 2025
CM launches ‘Mission YUVA’ at SKICC

Srinagar, Jun 28: Chief Minister Omar Abdullah Saturday launched the much-anticipated Mission YUVA (Yuva Udyami Vikas Abhiyan) at the Sher-e-Kashmir...

Read more
by LCT Desk
0 Comments
National

PM determined to make India developed country by 2047: Amit Shah

June 29, 2025
Govt committed to make India drug-free nation: Amit Shah

New Delhi, Jun 28: Asserting that Prime Minister Narendra Modi is determined to make India developed country by 2047, Union...

Read more
by LCT Desk
0 Comments
Top News

Mercury rises again, Srinagar records 32.3 degrees Celsius

June 29, 2025
Kashmir parts witness unexpected rise in day temperature

Srinagar, Jun 28: With no major wet spell in Jammu and Kashmir, the region has once again witnessed hot weather...

Read more
by LCT Desk
0 Comments
Top News

Take proactive measures to mitigate potential threats: DGP directs officers

June 29, 2025
J&K Police won’t sleep till it stops activities of Pakistan sponsored terrorists: DGP

Jammu, Jun 28: Directing officers to take proactive and preventive measures to mitigate potential threats, Director General of Police (DGP)...

Read more
by LCT Desk
0 Comments
Top News

MHA determines 8 vacancies for IPS induction in J&K segment of AGMUT cadre

June 29, 2025
Militancy related incidents decline by 32% in JK till Jul 30: MHA

Srinagar, Jun 28: The Ministry of Home Affairs (MHA) has identified eight IPS vacancies for induction from the Jammu &...

Read more
by LCT Desk
0 Comments
Next Post
Coronavirus: 5 patients die, 1086 test positive in JK

Coronavirus: JK reports two deaths, 692 new cases

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service

© 2021 Lake City Times - Premium theme by GITS.

No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper

© 2021 Lake City Times - Premium theme by GITS.