• About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service
Thursday, June 4, 2026
Lake City Times
No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
No Result
View All Result
Lake City News
No Result
View All Result
Home Top News

JK on mission to become largest clean energy-producing UT

200 MW grid-tied rooftop solar power plants to be installed on residential buildings

LCT Desk by LCT Desk
July 28, 2022
in Top News
Reading Time: 3min read
A A
Share on FacebookShare on TwitterWhatsappTelegram

READ ALSO

NC to protest over statehood demand in New Delhi

Functioning of ministers comes under scanner at CM’s meet with MLAs

Srinagar, Jul 27: J&K is on a mission to become one of the largest clean energy-producing UT in the country with an objective to reduce dependency on conventional sources of energy and enable J&K in attaining self-sufficiency in its energy needs.
J&K Government recognizes that renewable energy can also significantly increase J&K’s and the Nation’s energy security.
To achieve this milestone, the work is going on to implement the Government of India’s Grid-connected Rooftop Solar Scheme, Phase-II for the residential sector in Jammu to ensure that the electricity needs of the city are fully met from solar energy.
Under the project, 200 MW grid-tied rooftop solar power plants will be installed on 50,000 residential buildings in Jammu city by the Jammu and Kashmir Energy Development Agency (JAKEDA) under its “Solar City Mission” at an estimated cost of Rs 1040 crore. The project will be completed by March, 2024 and will have a lifetime of 25 years.
The Rooftop Solar Programme will provide subsidized installation of solar power panels on residential houses at the cost of Rs. 58,739, Rs. 53,995, Rs. 52,594, and Rs. 51,309 for Category-A (Up to 1 kW), Category-B (> 1 kW to 2 kW), Category-C (> 2kW up to 3 kW), and Category-D (> 3 kW up to 10 kW), respectively.
The Central Sector Scheme provides a central subsidy component of 40% of the project cost and a state subsidy component of 25% of the project cost for the installation of solar power panels, below 3 kW capacity, beyond which the central subsidy component remains at 20%. The subsidy is provided to the beneficiaries through the DBT mode.
An official said that these rooftop solar power plants will be connected to the grid on a net metering basis. The investments made by the beneficiaries will be recovered at a rate of 25% annually on account of the saving of energy, with a payback period of approximately 4 years.
With the implementation of the project, J&K will benefit from the generation of approximately 280 million units of energy annually, with a corresponding reduction in carbon emissions of approximately 5.44 million tons, besides reaping gains from savings on account of inter-state transmission losses to the tune of 224 million units, he added.
The generation of solar energy through the Rooftop Solar Programme will also help the energy-deficit UT of J&K in supplementing its energy needs, while assisting the DISCOMs in achieving the Renewable Purchase Obligation (RPO) targets of 10.5% as fixed by the Government of India.
The project will also provide employment opportunities to local youth. Based on employment estimates, it is calculated that the 1 MW rooftop solar PV project generates a total of 40 full-time equivalent (FTE) jobs over the 25 years expected lifetime of the project, which includes highly skilled personnel for business development, design, sales, procurement, and project management; one-time jobs for construction and installation of the rooftop PV system; and unskilled resources required annually for cleaning activity of the plant.
The scheme mandates implementing agency, viz. JAKEDA to provide regular quality supervision and certification of the quality of material to be installed; periodic monitoring of physical progress and third-party quality checks from MNRE approved test centres; provide free maintenance for a period of 5 years post installation; install bi-directional net-meters; and ensure project completion within the given timelines.
J&K has a good potential for solar energy and the renewable energy capacity would help to bridge a part of its power requirement. Under the new budget in PM KUSUM Scheme, 375 Solar Water Pumps will be installed in 2022-23 providing electricity benefit to 47159 souls, direct agriculture benefit to 18750 souls, and indirect agriculture benefit to 160000 souls.
Notably, Prime Minister Narendra Modi inaugurated a 500-kilowatt solar power plant at Village Pali of Samba which will make it India’s first “carbon-neutral Panchayat.

Related Posts

Top News

NC to protest over statehood demand in New Delhi

June 4, 2026
People of JK being sidelined systematically: NC

Srinagar, Jun 3: The National Conference on Wednesday announced it will hold a protest in New Delhi on the first...

Read more
by LCT Desk
0 Comments
Top News

Functioning of ministers comes under scanner at CM’s meet with MLAs

June 4, 2026
Functioning of ministers comes under scanner at CM’s meet with MLAs

Srinagar, Jun 3: MLAs of the ruling National Conference as well as independent legislators supporting the government gunned for Deputy...

Read more
by LCT Desk
0 Comments
Top News

Dachigam turns political-media hub

June 4, 2026
Dachigam turns political-media hub

Srinagar, Jun 3: The quiet wilderness of Dachigam National Park on Wednesday turned into an unusual political and media hub...

Read more
by LCT Desk
0 Comments
Politics

Dachigam mirrors Omar’s govt: Sajad Lone

June 4, 2026
Will go on hunger strike if electoral demography of JK changed: Sajad Lone

Srinagar, Jun 3: Peoples Conference president Sajad Gani Lone Wednesday took a swipe at Chief Minister Omar Abdullah for holding...

Read more
by LCT Desk
0 Comments
Top News

Amit Shah to chair high-level J&K security review meeting on Jun 8

June 4, 2026
Amit Shah to review J&K security at high-level meet in Delhi today

New Delhi, Jun 3: Union Home Minister Amit Shah will chair a high-level security review meeting on Jammu and Kashmir...

Read more
by LCT Desk
0 Comments
Top News

Zojila Tunnel: Gadkari to trigger breakthrough blast

June 4, 2026
Zojila Tunnel: Gadkari to trigger breakthrough blast

Ganderbal, Jun 3: The strategically significant 13.15-kilometre Zojila Tunnel, linking Jammu and Kashmir with Ladakh, is set to reach a...

Read more
by LCT Desk
0 Comments
Next Post
Coronavirus: 5 patients die, 1086 test positive in JK

Coronavirus: JK reports two deaths, 692 new cases

  • About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service

© 2021 Lake City Times - Premium theme by GITS.

No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper

© 2021 Lake City Times - Premium theme by GITS.