• About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service
Monday, September 7, 2026
Lake City Times
No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
No Result
View All Result
Lake City News
No Result
View All Result
Home News

Damaged by flash floods, footbridge awaits repair at Rafiabad’s Chanam

LCT Desk by LCT Desk
March 24, 2023
in News
Reading Time: 1min read
A A
Share on FacebookShare on TwitterWhatsappTelegram

READ ALSO

Referral Judges must refer right case at right time: Justice Rajnesh Oswal

IGP Kashmir reviews security, law & order in Pulwama, Awantipora

Baramulla, Mar 24: Washed away by flash floods, a footbridge at Hardu Chanam in Baramulla’s Rafiabad village still awaits completion with locals facing hardship to commute.
Locals said that the bridge over Nallah Hamal collapsed several years ago due to flash flood but the authorities haven’t taken up its repair so far.
They said the authorities built a temporary bridge over the Nallah but that too was damaged in 2021, making it unsafe.
“It’s a matter of concern as there lies every apprehension of any untoward incident as the bridge over Nallah Hamal connects High School, Chanam. Students have to cross the Nallah on a daily basis,” said a local, demanding the bridge be repaired at the earliest.
Another local said the authorities should have repaired the bridge for the safety of people especially students but they seem to wait for an accident to happen.
They however, urged the Lieutenant Governor led administration to look into the matter, so that it could give a sigh of relief to them.
An assistant executive engineer, roads and buildings (R&B) department, Watergam when contacted said that the said bridge was constructed by the Block (Rural development department) and doesn’t pertain to them.
Block Development Officer (BDO), Dangiwacha Abdul Rashid said that the footbridge construction has been delayed due to lack of funds. “Once the funds will be allocated, the construction process will start”, he said. (KNO)

Related Posts

News

Referral Judges must refer right case at right time: Justice Rajnesh Oswal

September 7, 2026
Referral Judges must refer right case at right time: Justice Rajnesh Oswal

Srinagar, Sep 6: A one day training programme for the Referral Judges was conducted Sunday at the Jammu & Kashmir...

Read more
by LCT Desk
0 Comments
News

IGP Kashmir reviews security, law & order in Pulwama, Awantipora

September 7, 2026
IGP Kashmir reviews security, law & order in Pulwama, Awantipora

Awantipora, Sep 6: Inspector General of Police, Kashmir Zone, Sujit Kumar, Sunday conducted extensive security and operational review visits to...

Read more
by LCT Desk
0 Comments
News

Illegal mining mafia puts Jhelum, private land, public infrastructure at risk

September 7, 2026
Illegal mining mafia puts Jhelum, private land, public infrastructure at risk

Pulwama, Sep 6: The River Jhelum and its adjoining areas in Alochibagh-Sambora, Pampore, are allegedly facing a fresh threat from...

Read more
by LCT Desk
0 Comments
News

Water crisis end in Panzinara, residents hail Tariq Karra

September 7, 2026
‘Only 53 per cent of JK’s rural population has access to adequate drinking water’

Srinagar, Sep 6: Acute water shortage in Panzinara area of Srinagar came to an end on Sunday, with residents crediting...

Read more
by LCT Desk
0 Comments
News

Ashok Koul reviews ongoing programmes with all BJP Morchas in Srinagar

September 7, 2026
J&K to get statehood soon: Ashok Koul

Srinagar, Sep 6: The Bharatiya Janata Party (BJP) General Secretary (Org.), Jammu Kashmir, Ashok Koul, alongside BJP General Secretary J&K...

Read more
by LCT Desk
0 Comments
News

Police arrest four persons in Shopian for drug consumption, test positive for THC

September 7, 2026
Goldsmith helps police nab fraudster in Budgam

Shopian, Sep 6: Police have arrested four persons for alleged drug consumption after they were intercepted during routine patrolling at...

Read more
by LCT Desk
0 Comments
Next Post
After Div Com’s direction, night bus service starts on two routes in Sgr

After Div Com’s direction, night bus service starts on two routes in Sgr

  • About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service

© 2021 Lake City Times - Premium theme by GITS.

No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper

© 2021 Lake City Times - Premium theme by GITS.