• About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service
Monday, September 7, 2026
Lake City Times
No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper
No Result
View All Result
Lake City News
No Result
View All Result
Home News

Chief Secretary reviews functioning of PWD

Directs macadamization of 8000 km of road by March 2022

LCT Desk by LCT Desk
December 2, 2021
in News
Reading Time: 2min read
A A
Share on FacebookShare on TwitterWhatsappTelegram

READ ALSO

Referral Judges must refer right case at right time: Justice Rajnesh Oswal

IGP Kashmir reviews security, law & order in Pulwama, Awantipora

Jammu, Nov 2: The Chief Secretary, Dr. Arun Kumar Mehta chaired a meeting to review the functioning of the Public Works (R&B) Department and take stock of progress made under the flagship programme, ‘Pradhan Mantri Gram Sadak Yojana’ (PMGSY).
Principal Secretary, Public Works (R&B) Department and the concerned officers of the Department were present in the meeting.
It was informed that presently the Department is maintaining 41,584 km road length across Jammu and Kashmir which includes National Highways, PMGSY, R&B roads and 1343 bridges.
Under PMGSY I & II, sanction was given to 3463 schemes including 241 bridges covering a length of 19,078.34 km to connect 2144 habitations at an estimated cost of Rs. 12,592.46 crore.
It was informed that so far the Department has completed 2400 schemes including 132 bridges, with a length of 15,802.34 km and connected 2026 habitations.
In the current financial year, the Department has completed 272 schemes with a length of 1500 km to connect 69 habitations and will also target completion of additional 880 schemes and 2000 km of road length in the next four months.
The Chief Secretary asked the Department to focus on providing connectivity to all habitations with population of over 1000 as per the 2011 census through the time-bound implementation of PMGSY and NABARD projects in the road sector by March 2023.
To ensure hassle-free and time-bound shifting of various utilities, the Chief Secretary directed the constitution of a standing committee comprising the Administrative Secretaries and officers of the departments of Jal Shakti, Power Development, and Public Works (R&B). The committee will formulate a mechanism and accordingly draw a road map to ensure resolution of issues hampering the process of utility shifting.
The Department was also asked to keep a check on the quality standards of new constructions and ensure the creation of high quality infrastructure, besides undertaking routine inspections with focussed attention on maintenance work. It was further asked to focus on developing proper drainage and camberage for surface water drainage so as to prevent road damage during heavy rainfalls.
Moreover, the Department was asked to prioritize blacktopping of roads towards developing and maintaining pothole-free roads in Jammu and Kashmir. The Department will be macadamizing 8,000 km of road length during 2021-22 during this financial year.
Under the 3rdphase of PMGSY, the PWD Department has submitted a proposal identifying 1,750 km of rural roads to be developed in the next financial year.
The Chief Secretary also reviewed issues related to un-awarded works, forest clearances, land acquisition, quality standards, and utility shifting.
Over the years, the Public Works Department has been registering progressive achievements under the Pradhan Mantri Grameen Sadak Yojana. The Department has achieved completion of 1500 km of rural road in the first three quarters of current financial year which far exceeds the achievement of 1325 km registered in the financial year 2019-20.
The Department completed approximately 1785 km road length (under 89 schemes) in the financial year 2016-17, 1804 km (under 151 schemes) in 2017-18, 1622 km (under 226 schemes) in 2018- 19, 1325 km (under 214 schemes) in 2019-20, 3167 km (under 272 schemes) in 2020-21, and is likely to surpass last year achievement this year.

Related Posts

News

Referral Judges must refer right case at right time: Justice Rajnesh Oswal

September 7, 2026
Referral Judges must refer right case at right time: Justice Rajnesh Oswal

Srinagar, Sep 6: A one day training programme for the Referral Judges was conducted Sunday at the Jammu & Kashmir...

Read more
by LCT Desk
0 Comments
News

IGP Kashmir reviews security, law & order in Pulwama, Awantipora

September 7, 2026
IGP Kashmir reviews security, law & order in Pulwama, Awantipora

Awantipora, Sep 6: Inspector General of Police, Kashmir Zone, Sujit Kumar, Sunday conducted extensive security and operational review visits to...

Read more
by LCT Desk
0 Comments
News

Illegal mining mafia puts Jhelum, private land, public infrastructure at risk

September 7, 2026
Illegal mining mafia puts Jhelum, private land, public infrastructure at risk

Pulwama, Sep 6: The River Jhelum and its adjoining areas in Alochibagh-Sambora, Pampore, are allegedly facing a fresh threat from...

Read more
by LCT Desk
0 Comments
News

Water crisis end in Panzinara, residents hail Tariq Karra

September 7, 2026
‘Only 53 per cent of JK’s rural population has access to adequate drinking water’

Srinagar, Sep 6: Acute water shortage in Panzinara area of Srinagar came to an end on Sunday, with residents crediting...

Read more
by LCT Desk
0 Comments
News

Ashok Koul reviews ongoing programmes with all BJP Morchas in Srinagar

September 7, 2026
J&K to get statehood soon: Ashok Koul

Srinagar, Sep 6: The Bharatiya Janata Party (BJP) General Secretary (Org.), Jammu Kashmir, Ashok Koul, alongside BJP General Secretary J&K...

Read more
by LCT Desk
0 Comments
News

Police arrest four persons in Shopian for drug consumption, test positive for THC

September 7, 2026
Goldsmith helps police nab fraudster in Budgam

Shopian, Sep 6: Police have arrested four persons for alleged drug consumption after they were intercepted during routine patrolling at...

Read more
by LCT Desk
0 Comments
Next Post
JeM militant, 3 OGWs arrested in Kulgam

Police solve Palhalan grenade attack case, 3 militant associates held

  • About Us
  • Contact Us
  • Our Team
  • Advertising
  • Privacy Policy
  • Terms of Service

© 2021 Lake City Times - Premium theme by GITS.

No Result
View All Result
  • Top News
  • Region
  • City News
  • Politics
  • Business
  • Health
  • Edit-Oped
  • Tourism
  • National
  • World
  • ePaper

© 2021 Lake City Times - Premium theme by GITS.